Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13634783

- Product Categories
- Friendly Links
- home > Supply > Bucket elevator quotes, Qingdao Xudong electrical equipment (certified), bucket elevator
Information Name: | Bucket elevator quotes, Qingdao Xudong electrical equipment (certified), bucket elevator |
Published: | 2015-03-20 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Installation Requirements 1, bucket elevator must be securely mounted on a solid concrete foundation. Surface concrete foundation should be flat and horizontal state guarantee after bucket elevator reaches the vertical installation requirements. Height higher bucket elevator in which the Ministry of housing and proper position of the upper casing shall be its adjacent buildings (such as silos, workshops, etc.) together in order to increase its stability. Installed when you install the lower part, the anchor bolt chain bucket elevator, and then install the middle of the case, after Ann upper housing. Cabinet installation is successful, correct verticality. Measured with a vertical line down the full height, the error should be less than 10mm. Should be parallel to the vertical axis, the axial center line should be in the same plane. The height of the lower bucket elevator installation, you can put on, in all lower case is connected to the ground plane and the more precisely, and then hanging straight overall fixed concrete foundation. 2, the rear housing is installed, the installation of the chain and the hopper. Links with the U-shaped hopper screw bucket elevator, both chain joints, but also the hopper holder. U-type screw and tighten the nut must be reliable locking. 3, after the chain and the hopper is installed, properly tensioned. 4, to add gear and bearing were appropriate number of oil and butter. Industrial gear reducer with oil lubrication. Sodium with calcium-based or butter can be within the bearing. 5, commissioning, should be empty after the installation is complete commissioning. Air operation should note: You can not reverse, can not have bump phenomenon. Air operation is not less than two hours, there should be overheating, bearing temperature does not exceed 250C, reducer temperature does not exceed 300C. After idling two hours, all the normal load test can be carried out. When feeding with a load test should be uniform, to prevent excessive feeding, the lower blockage resulting in "boring car." Safety regulations 1, hoist maintenance and managed by designated personnel, key power switch box managed by designated personnel. 2, hoist winch must limiter and stroke limiter limiter pulley should be raised to a distance 300mm drum or pulley before can automatically stop. 3, there should be the maximum load hoist flag at upgrading landing weight must not overload (1T). 4, power transmission, check the winch limiter, stroke limiter, interlock switches and other safety devices, sensitive, reliable, and try hanging. 5, lifting, before landing, after-ringing warning before driving. 6, depending on the hoist is not allowed manned, under. 7, after work, hoist hanging plate should supply bucket elevator floor, then cut off the power, shut the door and down the fence. 8, keep lifting machines surrounding environmental health. Routine maintenance: Note the following aspects of the daily routine maintenance should be in (a) routine inspection of the oil level should pay attention to slow down, pull out the oil marked deceleration, observe the oil level should be within the range of the scale, if that is not enough oil level should be complementary. (2) observe bucket elevator display current, should work within a reasonable range of supply current bucket elevator, bucket elevator to prevent overload (3) vibration of the observing bucket elevator, vibration trajectory bobbing as normal, or arc swing swing around as abnormal. (4) Open the door to observe, observe sprocket and hopper operation smoothly without apparent beating as normal, there are severe vibration or abnormal sound is abnormal bucket elevators offer, Qingdao Xudong electrical equipment (certified), bucket elevator provided by the Qingdao Power Equipment Co., Ltd. Xudong. Power Equipment Co., Ltd. Qingdao Xudong (www.qdxudong.com) (www.qdxudong.com) is a leader in Qingdao, Shandong Province, industry-specific equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, the maximum to meet customer needs. Power Equipment in Qingdao Xudong leadership with the staff warmly welcome all inquiries negotiations to create electrical equipment Qingdao Xudong a better future. You can also access (www.qdxudong.com/supply_details_51243580.html), for more information about the company. |
Admin>>>
You are the 16637 visitor
Copyright © GuangDong ICP No. 10089450, Power Equipment Co., Ltd. Qingdao Xudong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 16637 visitor
Copyright © GuangDong ICP No. 10089450, Power Equipment Co., Ltd. Qingdao Xudong All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility